Located in the centre of the french Atlantic coast, the Shipbuilding and Repair Centre has powerful tools and brings together companies with complementary expertise in the field of repair and shipbuilding. Atlantic Port La Rochelle offers specialised human and technical resources for the activity of this site.
Sea Pole La Rochelle brings together companies from La Rochelle in the shiprepair and shipbuilding sector. With this new brand, they intend to highlight their skills and expertise as well as the quality of their infrastructure and tools (workshops, careening area, dry docks, fitting-out wharfs, ship lifts) on a secure site, ideally located on the Atlantic coast.
For merchant fleets, fishing fleets, civilian or military administration fleets, yacht fleets, the Sea Pole La Rochelle companies propose a complete range of services in shiprepair and shipbuilding : Sea Pole La Rochelle
Major infrastructures
The dry docks :
1 Dock n° 1: useful length 176 m, useful width 21,86 m
2 Dock n° 2: useful length 107 m, useful width 13,84m
Repair area afloat and dry :
3 A careening area for dry repairs of 6 000 m².
4 Three docks repair afloat:
- Quai Camaret pier equipped with a pontoon (90m) with secure access,
- Central barrier of the wet dock (see photo below)
- Berth n°1 Lock basin
Tools :
5 An elevator 250 tonnes.
Services :
A secure area under 24h / 24, 7 days / 7 surveillance in accordance with ISPS regulations,
Emergency supplied 1,000 kVA electrical substation.
6 An area for waste collection.
A port certified ISO 9001 and ISO 14001 on all its activities.
The site is connected to a treatment unit of runoff water.
Dock N° 1
DESCRIPTION
Useful length: 176 m
Useful width: 21,86 m
Dry end timing: 6 hours
Dedicated area surrounding dock: 2,000 m2
AT DISPOSAL
Available power supply:
1 plug 400V 125A (3-phase + neutral + earth)
1 plug 400V 63A (3-phase + neutral + earth)
2 plugs 230V 16A (phase + neutral + earth)
3 electrical outlets adjustable from 50A to 250A (3-phase + neutral)
Fresh water supply
Fire defences
Dock N° 2
DESCRIPTION
Useful length: 107 m
Useful width: 13,84 m
Dry end timing: 3 hours
Dedicated area surrounding the dock: 2,000 m2
AT DISPOSAL
available power supply:
3 plugs 400V 125A (3-phase + neutral + earth)
6 plugs 400V 63A (3-phase + neutral + earth)
6 plugs 230V 16A (3-phase + neutral + earth)
Fresh water supply
Fire hydrant alongside the dock